Amulsar Gold Project

 

Contractor:  "Lydian Armenia" CJSC

Start date:   August 25, 2017

Completion date:  Continues

 

Since 2017 “HAEK-I Shinararutiun” CJSC implements the installation and construction works of AMULSAR GOLD PROJECT in Vayots Dzor province, RA. The massive industrial construction includes the following structures,

 

Primary and secondary crushin facility

 Screening facility

 Inland conveyors

 Control station

 Coarse and fine ore reclaim tunnels

 Overland conveyor drive station of 5400 m length

3 wildlife crossings

Sampling building

Truck load out

Lime silos area

Cyanide area 

3 dust collectors

ADR area (adsorption desorption recovery)

Structural,mechanical piping and electrical system (SMPE)       


                                          

The above mentioned works perform in the height of 1600-2600m.